0
image
image
image
CNC Machining parts

high quality billet aluminum cnc machining anodized aluminum parts/cnc machined aluminum parts

Chimold-CNC-04
Quantity:
Contact Now
add to cart

Product Name

CNC Manufacturer Engineering Components Mechanical Stainless Steel aluminum titanium milling turning service CNC machining parts

Service

CNC Turning, CNC Milling, Laser Cutting, Bending, Spinning, Wire Cutting, Stamping, Electric Discharge Machining (EDM), Injection Molding

Materials

Aluminum: 2000 series, 6000 series, 7075, 5052, etc.

Stainless steel: SUS303, SUS304, SS316, SS316L, 17-4PH, etc.

Steel: 1214L/1215/1045/4140/SCM440/40CrMo, etc.

Brass: 260, C360, H59, H60, H62, H63, H65, H68, H70, Bronze, Copper

Titanium: GradeF1-F5

Plastic: Acetal/POM/PA/Nylon/PC/PMMA/PVC/PU/Acrylic/ABS/PTFE/PEEK etc.

Surface Treatment Available

Anodize, Bead blasted, Silk Screen, PVD Plating, Zinc/Nickel/Chrome/Titanium Plating, Brushing, Painting, Powder Coated,Passivation, Electrophoresis, Electro Polishing, Knurl, Laser/Etch/Engrave, etc.

Tolerance

+/-0.01mm, 100% QC quality inspection before delivery, can provide quality inspection form

Surface Roughness

Min Ra0.1~3.2

Drawing Accepted

Stp, Step, Igs, Xt, AutoCAD(DXF, DWG), PDF, or Samples

Service Project

To provide production design, production and technical service, mould development and processing, etc

Testing equipment

CMM;Tool microscope;multi-joint arm;Automatic height gauge;Manual height gauge;Dial gauge;Marble platform;Roughness measurement

Lead Time

1-2 weeks for samples, 3-4 weeks for mass production

Our Advantages

9+ years of experience in the CNC machining area and have a senior design team to offer perfect modification suggestions

 
 

FAQ
 

Q1: Are you trading company or manufacturer?

A: We are the factory, manufacturer and producer.

Q2: How long is your delivery time?

A: It depends on the mould base size and complexity. Generally Speaking, the leading time is 5 -15 working days.

Q3: Do you provide sample? Is it for free?

A: Yes, we would like to produce the sample set for customer. But as you know, they are mostly custom made goods, we hope that you will agree to pay for the production and freight cost.

Q4: What is your terms of payment?

A: Payment<=1000USD, 100% T/T in advance.
    Payment>=1000USD, 50% deposit T/T in advance, and 50% balance T/T before delivery.

Thanks a lot for visiting our online website!
If you have any other question, please feel free to contact us. We will reply to you within 24 hours.